El acero

Recuperacion de tierras de la autopista de Bien Hoa Vung Trafico a traves del distrito de Long Con exito mas del 97%

|

Dong Nai - Long Thanh District movilizado para entregar el suelo mas de 222 hectareas, llegando a mas del 97% de la superficie terrestre recuperada del proyecto de la autopista Bien Hoa - Vung Tau.

Un camion se incendio en la autopista Longcheng-Doi Yao

|

El camion que circulaba en el puente Long Thanh perteneciente a la autopista Long Thanh-Doi Cai, en direccion a la capital, repentinamente se incendio intensamente y el atasco duro mucho tiempo.

Una empresa en el distrito industrial mas antiguo de Vietnam fue suspendida y forzada a trasladarse

|

El inspector del Departamento de Agricultura y Medio Ambiente de Dong Nai sanciono a la compañia de cableado electrico en el Parque Industrial Bien Hoa 1 con 65 millones de dongos, obligando a la evacuacion de las instalaciones.

Momento de recuperacion de tierras de las empresas en el complejo industrial mas antiguo de Vietnam

|

Dong NAI - El Centro de Desarrollo del Fondo de Tierras Provinciales implemento el Plan de Adquisicion de Tierras para implementar el proyecto de convertir el Parque Industrial Bien Hoa 1.

En 2025, Dong Nai se esfuerza por comenzar la construccion de casi 12.000 viviendas sociales

|

Segun el Departamento de Construccion, en 2025 en la provincia se esforzara por comenzar la construccion de 11.953 viviendas sociales en 13 proyectos.

Highway closes, it is National Highway 1 through Dong Nai province that is congested for a long time

|

Dong Nai - On the evening of April 7, a stream of vehicles poured into Ho Chi Minh City after the Hung Vuong Ancestor's Commemoration Day holiday, the section passing through Trang Bom district was congested for about 10km, many sections were jammed.

Construction through ceremony to make up for the slow progress of the expressway project through Dong Nai

|

Dong Nai - Bien Hoa - Vung Tau Expressway and Ho Chi Minh City Ring Road 3 are under construction during the Hung Vuong Commemoration Ceremony to make up for the delay in progress of these two previous projects.

Training on AI application for over 300 union officials in Dong Nai

|

Dong Nai - More than 300 union officials have been trained in how to design lectures, skills in using and applying AI in performing professional tasks.

2 young men suspected of committing suicide by jumping off a bridge in Dong Nai

|

On the afternoon of April 6, the Fire Prevention and Rescue Police Department, Dong Nai Provincial Police found the body of a young man suspected of jumping off Hoa An bridge (Bien Hoa city).

Garment company in Dong Nai rewards 2,300 workers for Hung Vuong's Commemoration Day holiday

|

Dong Nai - Dong Phu Cuong Joint Stock Company's Trade Union awarded 2,300 workers on the occasion of Hung Vuong's Commemoration Day with a total amount of 440.5 million VND.

The delegation of officers and soldiers parading was moved by the affection of the army and people at Bien Hoa station

|

Dong Nai - On April 5, the train carrying officers and soldiers from all blocs participating in the parade and marching to the South on the occasion of the April 30th holiday was warmly welcomed by the people.

The pink balls parading and parading on the occasion of the April 30 holiday were warmly welcomed in Dong Nai

|

Dong Nai - At noon on April 5, the parade and parade in the 50th anniversary of the liberation of the South and National Reunification (April 30, 1975 - April 30, 2025) arrived at Bien Hoa station.

Building 2 modern metro lines connecting Ho Chi Minh City, Binh Duong, Dong Nai

|

Ho Chi Minh City is promoting the plan to extend Metro Line 1 (Ben Thanh - Suoi Tien) connecting to Binh Duong and Dong Nai provinces.

Dong Nai prepares to welcome groups of parades and parades on the occasion of April 30

|

Dong Nai province welcomed delegations and blocks participating in the parade and march in the 50th anniversary of the liberation of the South and national reunification.

Panorama of raising the steel roof of Long Thanh airport terminal weighing 5,300 tons using a pull-up and push-up solution

|

Dong Nai - The steel roof of the Long Thanh airport passenger terminal weighing 5,300 tons was successfully lifted with a towing and pushing solution using a hydraulic shock system.